Sebastopol construction

The first thing that comes to mind when I try to describe the Sebastopol central office is “cute”. It reminds me of Sonic.net’s old datacenter; crowded, small, but with purpose. It’s a plucky little CO.

Yesterday we began the installation process in Sebastopol for our next generation products: FlexLink for medium sized businesses and enterprise and Fusion for small business and home. The first cabinet went in (low ceiling!), and the drilling has begun. Two holes down this afternoon, two to go.

We should be bolted down tomorrow, then equipment rack-in, power turn-up, and copper termination. The last part will probably take the longest, as we are pre-building a lot of copper capacity, and it is all done by hand.

Reblog this post [with Zemanta]